Power Grid: Quebec/Baden-Wrttemberg Expansion Board Game
IDR. 235.000

Monopolis Power Grid: Qubec/Baden-Wrttemberg Expansion Tabletop, Board and Card Game
SHARED TO :
0
in stock
235000
Add to Wishlist
Weight: 
1000 g
AgesMax: 
100
12+
2
-
6
90 minutes

CONTENT

For 2-6 Players (Best With 4-5 Players)
Playing Time: 90 Minutes
Recommended Age: 12+

Need base game To play.

DESCRIPTION

The two maps included in Power Grid: Qubec & Baden-Wrttemberg were previously released in two separate Power Grid base games: Qubec is part of Mgawatts, the French edition of the game released by Filosofia, while Baden-Wrttemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.

In Qubec, the Canadian province Qubec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will remain until purchased by a player or removed when the number on it is lower than the number of cities power by any player. The two cities of Montreal and Qubec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.

In Baden-Wrttemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may be connected only starting in step 2.

Only a single printing of Power Grid: Quebec & Baden-Wrttemberg will be produced, although the Qubec map will remain available in Mgawatts.

Comments